From here, I gave a list of things which the Director of this project had to give me by Monday 4th February, this included:
- Script finalised and formatted
- Initial Character Sketches
- Inspirations and Mood Boards
It came to my and none of these things had been given to me. Following this further it appeared as though a rough storyboard had been done by the Director of the project without a finished script, as a sort of stand in. I asked again for the script and I was given a google drive link for me to look at.
The script showed promise however a lot of things had not been considered, and therefore I made the suggestion that he talk to a tutor to get feedback on the story and I made my own comments and edit suggestions on this google drive link. I have given a new deadline of Sunday 11th February to have the script completed and the other resources I need to be shared or I will move on from the project.